EXPERINCE PT RAGHEEDA ARTANTI OTODAN

ENGINEERING


  1. 1 . Assist Electrical Engineer Recovery Power outage Unit – 4 Kamojang (PT Pertamina Geotermal Energy) 2022


-


CONSTRUCTION


  1. 1 . Instrument Installation
  2. a. Project activity : Installation Field Instrument, Tubing Installation and Support, WTP, WWTP, Aux Boiler, Clorine, Amonia, Fly Ash Handling, Coal Run Off, Cems,ETG Air Compressor, Bottom Ash Silo Area 
  3. b. Name Project : PLTU Tanjung Jati B Expansion (Jawa-4), Coal Fired Steam Power Plant 2x1000MW Unit 5-6. 
  4. c. Client :PT. Bhumi Jati Power 
  5. d. Under Subcontract PT Satyamitra Surya Perkasa (SSP) 
  6. e. Year 2019 until 2021.

  1. 2. Instrument Installation
  2. a.Project activity :Installation Field Instrument, Tubing Installation and Support, Boiler, Cimney and Minimex Area
  3. b. Name Project : Lontar Extension Coal Fired Steam Power Plant 1 x 315MW 
  4. c. Client : PT PLN
  5. d. Under Subcontract : PT Satyamitra Surya Perkasa (SSP) 
  6. e.Year 2019 until 2020.

  1. 3. Electrical Installation
  2. a.Project activity :Installation 
HV Termination 150kV Gantry to LA&CB.
  1. b. Name Project : Lontar Extension Coal Fired Steam Power Plant 1 x 315MW 
  2. c. Client : PT PLN
  3. d. Under Subcontract : PT Satyamitra Surya Perkasa (SSP) 
  4. e.Year 2020.

PRODUCTION AND SERVICES

  1. 1. Supply VAC Single Phase Transformer Central Java 2 x 1000 MW CFPP Project PT Black & Veatch (BV) 2019

  1. 2. Supply Soft starter  Module Central Java 2 x 1000 MW CFPP Project PT Black & Veatch (BV) 2019

  1. 3. DC Hi-pot For MV Power Cable Central Java 2 x 1000 MW CFPP Project PT Satyamitra Surya Perkasa (SSP) 2019

  1. 4. AC Hi-pot For o Insulation Phase Busduct (IPBD) Lontar Extension Coal Fired Steam Power Plant 1 x 315MW Project PT Satyamitra Surya Perkasa (SSP) 2019

  1. 5. AC Hi-pot For o non-segregated phase bus duct (NSPBD) Lontar Extension Coal Fired Steam Power Plant 1 x 315MW Project PT Satyamitra Surya Perkasa (SSP) 2019.

  1. 6. Splicing and OTDR Fibre Optic Cable Central Java 2 x 1000 MW CFPP Project PT Satyamitra Surya Perkasa (SSP) 2019.

  1. 7. DC Hi-pot For MV Power Cable Central Java 2 x 1000 MW CFPP PT BUT BLACK & VEATCH INTERNATIONAL COMPANY

  1. 8. AC Hi-Pot Test for NPB Bus Tie for Unit 6 and Common, PLTU Tanjung Jati B Expansion (Jawa-4), 2x1000MW Unit 5-6 PT Toshiba Asia Pacific Indonesia (TAPI) 2020

9. DC Hi-pot For MV Power Cable, PLTU Tanjung Jati B Expansion (Jawa-4), 2x1000MW Unit 5-6 PT Wasamitra Engineering (WME) 2020.

  1. 10. AC Hi-pot For o Insulation Phase Busduct (IPB) PLTU Tanjung Jati B Expansion (Jawa-4), 2x1000MW Unit 6 Project PT Toshiba Asia Pacific Indonesia (TAPI) 2020.

  1. 11. Calibration Field Instrument PLTU Tanjung Jati B Expansion (Jawa-4), 2x1000MW Unit 5-6 PT Satyamitra Surya Perkasa (SSP) 2019.

  1. 12. Calibration Field Instrument Lontar Extension Coal Fired Steam Power Plant 1 x 315MW PT Satyamitra Surya Perkasa (SSP) 2019.

  1. 13. Termination SC, FC, ST, Splicing and OTDR Fibre Optic Cable, PLTU Tanjung Jati B Expansion (Jawa-4), 2x1000MW Unit 5-6 PT Toshiba Asia Pacific Indonesia (TAPI) 2020

14. Termination & OTDR Fibre Optic Cable, PLTU Tanjung Jati B Expansion (Jawa-4), 2x1000MW Unit 5-6 PT Wasamitra Engineering (WME) 2020.

15. AC High Voltage Testing For Excitation Transformer, Insulation Phase Busduct(IPB), GMCB, AC NPB For Cirebon 2 Coal Fired Steam Power Plan Project 1 x 1000MW, PT Toshiba Asia Pacific Indonesia (TAPI)

  1. 16. Oil Transformer Treatment & Test Central Java 2 x 1000 MW CFPP PT BUT BLACK & VEATCH INTERNATIONAL COMPANY

  1. 17. Maintenance AC Ruang Office Security PT Indocement Tunggal Perkasa, Tbk

18. BCT Testing For Generator For Cirebon 2 Coal Fired Steam Power Plan Project 1 x 1000MW, PT Toshiba Asia Pacific Indonesia (TAPI) 2021


  1. 19. Service and Maintenance Air Conditioning For PT Indocement Tunggal Prakasa Tbk. at Cirebon Site 2021. 

20. Termination and OTDR Fiber Optic Cable For Cirebon 2 Coal Fired Steam Power Plan Project 1 x 1000MW, PT Hyundai Engineering & Construction 2021.

21. Calibration Instrument Service (pH Analyzer, Conductifity Analyzer, Turbidity Analyzer) , PLTU Tanjung Jati B Expansion (Jawa-4), 2x1000MW Unit 5-6 PT BUT Black & Veatch International Company 2022.

  1. 22. AC Hipot PLTU Tanjung Jati B Expansion (Jawa-4), 2x1000MW Unit 6 PT Hitachi Sakti Energy Indonesia 2022.

  2. 23. Splicing and OTDR Fiber Optic Cable For Manyar Smelter Desalination Project , PT BUT Black & Veatch 2023.

  3. 24. Hipot test Medium Voltage Switchgear and MCC, Cable For EPCI Akatara Gas Processing Facility and Sales Gas Pipeline Project , PT Globalindo Buana/Contractor JGC/Client PT Jadestone Energy (Lemang) Pte. Ltd  2023.

  4. 25. Contact Resistance and Resistance Test Busduct For EPCI Akatara Gas Processing Facility and Sales Gas Pipeline Project , PT Globalindo Buana/Contractor JGC/Client PT Jadestone Energy (Lemang) Pte. Ltd  2023.

  5. 26. Hipot test Medium Voltage Motor For Manyar Smelter Desalination Project , PT BUT Black & Veatch 2024.

Operation & Maintenance Service


  1. 1 . Instrument Maintenance

  2. a. Name Project : Sampling Rack and Analyzer Maintenance Tanjung Jati B Expansion (Jawa-4), Coal Fired Steam Power Plant 2x1000MW Unit 5-6. 
  3. b. Client :PT. Bhumi Jepara Service 
  4. c. Year 2022 until 2024.
  5. d. Equipment : - ph Analyzer
  6.                          - ph ORP Analyzer
  7.                          - Conductivity Analyzer
  8.                          - Turbidity Analyzer
  9.                          - Silica Analyzer
  10.                          - Sodium Analyzer
  11.                          - DO Analyzer
  12.                          - Chlorine Analyzer
  13.                          - Carbon Monoxide
  14.                          - Chimney Emission Flue Gas Flow                         


  1. 2 . Electrical & Instrument 

  2. a. Name Project : Jasa Perbaikan Minor Electrical & Instrument TA PLTP Kamojang Unit-4. 
  3. b. Client :PT. Pertamina Geotermal Energy (Area Kamojang) 
  4. c. Year 2022 .
  5. d. Equipment : - Control Panel 150kV
  6.                          - DCS 
  7.                          - Low Voltage MCC
  8.                          - Medium Voltage SWGR                    


  1. 3 . Electrical & Instrument 

  2. a. Name Project : Jasa Protection Relay Testing PLTP Unit 3&4 PT PGE Ulubelu. 
  3. b. Client :PT. Pertamina Geotermal Energy (Area Ulubelu) 
  4. c. Year 2022 - 2023 .
  5. d. Equipment : - Generator Protection Relay
  6.                            24, 27G, 27TN, 32G, 40G, 46G, 50BF, 51V,
  7.                            59G, 59N, 60G, 78G, 81L, 81H, 87G, 64F
  8.                          - Generator Transformer Protection Relay
  9.                             87GT, 87TN, 50/51GT, 51NGT
  10.                          - Unit Aux Transformer Relay
  11.                             87UAT, 50/51UAT, 51N UAT
  12.                          - Medium Voltage Protection Relay
  13.                          - Low Voltage Protection Relay
  14.                          - 150kV Protection Relay                   


  1. 4 . Electrical 

  2. a. Name Project :  Jasa Inspeksi SPB PLTP Unit 1 Lumut Balai . 
  3. b. Client :PT. Pertamina Geotermal Energy (Area Lumut Balai) 
  4. c. Year 2022 - 2023 .
  5. d. Equipment : - Routine maintenance SPB
  6.                         - Contact Resistance Test and Resistance Test SPB                            
  7.                         - Hi-Pot Test SPB              

analizer
WhatsApp Image 2022-09-07 at 09.31.01
1