EXPERINCE PT RAGHEEDA ARTANTI OTODAN

ENGINEERING
- 1 . Assist Electrical Engineer
Recovery Power outage Unit – 4 Kamojang (PT Pertamina Geotermal Energy) 2022
-
CONSTRUCTION
- 1 . Instrument Installation
- a. Project activity : Installation Field Instrument, Tubing Installation and Support, WTP, WWTP, Aux Boiler, Clorine, Amonia, Fly Ash Handling, Coal Run Off, Cems,ETG Air Compressor, Bottom Ash Silo Area
- b. Name Project : PLTU Tanjung Jati B Expansion (Jawa-4), Coal Fired Steam Power Plant 2x1000MW Unit 5-6.
- c. Client :PT. Bhumi Jati Power
- d. Under Subcontract PT Satyamitra Surya Perkasa (SSP)
- e. Year 2019 until 2021.
- 2. Instrument Installation
- a.Project activity :Installation Field Instrument, Tubing Installation and Support, Boiler, Cimney and Minimex Area
- b. Name Project : Lontar Extension Coal Fired Steam Power Plant 1 x 315MW
- c. Client : PT PLN
- d. Under Subcontract : PT Satyamitra Surya Perkasa (SSP)
- e.Year 2019 until 2020.
- 3. Electrical Installation
- a.Project activity :Installation
- 3. Electrical Installation
- a.Project activity :Installation
HV Termination 150kV Gantry to LA&CB.
- b. Name Project : Lontar Extension Coal Fired Steam Power Plant 1 x 315MW
- c. Client : PT PLN
- d. Under Subcontract : PT Satyamitra Surya Perkasa (SSP)
- e.Year 2020.
- b. Name Project : Lontar Extension Coal Fired Steam Power Plant 1 x 315MW
- c. Client : PT PLN
- d. Under Subcontract : PT Satyamitra Surya Perkasa (SSP)
- e.Year 2020.
PRODUCTION AND SERVICES
- 1. Supply VAC Single Phase Transformer Central Java 2 x 1000 MW CFPP Project PT Black & Veatch (BV) 2019
- 2. Supply Soft starter Module Central Java 2 x 1000 MW CFPP Project PT Black & Veatch (BV) 2019
- 3. DC Hi-pot For MV Power Cable Central Java 2 x 1000 MW CFPP Project PT Satyamitra Surya Perkasa (SSP) 2019
- 4. AC Hi-pot For o Insulation Phase Busduct (IPBD) Lontar Extension Coal Fired Steam Power Plant 1 x 315MW Project PT Satyamitra Surya Perkasa (SSP) 2019
- 5. AC Hi-pot For o non-segregated phase bus duct (NSPBD) Lontar Extension Coal Fired Steam Power Plant 1 x 315MW Project PT Satyamitra Surya Perkasa (SSP) 2019.
- 6. Splicing and OTDR Fibre Optic Cable Central Java 2 x 1000 MW CFPP Project PT Satyamitra Surya Perkasa (SSP) 2019.
- 7. DC Hi-pot For MV Power Cable Central Java 2 x 1000 MW CFPP PT BUT BLACK & VEATCH INTERNATIONAL COMPANY
- 8. AC Hi-Pot Test for NPB Bus Tie for Unit 6 and Common, PLTU Tanjung Jati B Expansion (Jawa-4), 2x1000MW Unit 5-6 PT Toshiba Asia Pacific Indonesia (TAPI) 2020
9. DC Hi-pot For MV Power Cable, PLTU Tanjung Jati B Expansion (Jawa-4), 2x1000MW Unit 5-6 PT Wasamitra Engineering (WME) 2020.
- 10. AC Hi-pot For o Insulation Phase Busduct (IPB) PLTU Tanjung Jati B Expansion (Jawa-4), 2x1000MW Unit 6 Project PT Toshiba Asia Pacific Indonesia (TAPI) 2020.
- 11. Calibration Field Instrument PLTU Tanjung Jati B Expansion (Jawa-4), 2x1000MW Unit 5-6 PT Satyamitra Surya Perkasa (SSP) 2019.
- 12. Calibration Field Instrument Lontar Extension Coal Fired Steam Power Plant 1 x 315MW PT Satyamitra Surya Perkasa (SSP) 2019.
- 13. Termination SC, FC, ST, Splicing and OTDR Fibre Optic Cable, PLTU Tanjung Jati B Expansion (Jawa-4), 2x1000MW Unit 5-6 PT Toshiba Asia Pacific Indonesia (TAPI) 2020
14. Termination & OTDR Fibre Optic Cable, PLTU Tanjung Jati B Expansion (Jawa-4), 2x1000MW Unit 5-6 PT Wasamitra Engineering (WME) 2020.
15. AC High Voltage Testing For Excitation Transformer, Insulation Phase Busduct(IPB), GMCB, AC NPB For Cirebon 2 Coal Fired Steam Power Plan Project 1 x 1000MW, PT Toshiba Asia Pacific Indonesia (TAPI)
- 16. Oil Transformer Treatment & Test Central Java 2 x 1000 MW CFPP PT BUT BLACK & VEATCH INTERNATIONAL COMPANY
- 17. Maintenance AC Ruang Office Security PT Indocement Tunggal Perkasa, Tbk
- 19. Service and Maintenance Air Conditioning For PT Indocement Tunggal Prakasa Tbk. at Cirebon Site 2021.
20. Termination and OTDR Fiber Optic Cable For Cirebon 2 Coal Fired Steam Power Plan Project 1 x 1000MW, PT Hyundai Engineering & Construction 2021.
21. Calibration Instrument Service (pH Analyzer, Conductifity Analyzer, Turbidity Analyzer) , PLTU Tanjung Jati B Expansion (Jawa-4), 2x1000MW Unit 5-6 PT BUT Black & Veatch International Company 2022.
- 22. AC Hipot PLTU Tanjung Jati B Expansion (Jawa-4), 2x1000MW Unit 6 PT Hitachi Sakti Energy Indonesia 2022.
Operation & Maintenance Service
- 1 . Instrument Maintenance
- a. Name Project : Sampling Rack and Analyzer Maintenance Tanjung Jati B Expansion (Jawa-4), Coal Fired Steam Power Plant 2x1000MW Unit 5-6.
- b. Client :PT. Bhumi Jepara Service
- c. Year 2022 until 2024.
- d. Equipment : - ph Analyzer
- - ph ORP Analyzer
- - Conductivity Analyzer
- - Turbidity Analyzer
- - Silica Analyzer
- - Sodium Analyzer
- - DO Analyzer
- - Chlorine Analyzer
- - Carbon Monoxide
- - Chimney Emission Flue Gas Flow
- 2 . Electrical & Instrument
- a. Name Project : Jasa Perbaikan Minor Electrical & Instrument TA PLTP Kamojang Unit-4.
- b. Client :PT. Pertamina Geotermal Energy (Area Kamojang)
- c. Year 2022 .
- d. Equipment : - Control Panel 150kV
- - DCS
- - Low Voltage MCC
- - Medium Voltage SWGR
- 3 . Electrical & Instrument
- a. Name Project : Jasa Protection Relay Testing PLTP Unit 3&4 PT PGE Ulubelu.
- b. Client :PT. Pertamina Geotermal Energy (Area Ulubelu)
- c. Year 2022 - 2023 .
- d. Equipment : - Generator Protection Relay
- 24, 27G, 27TN, 32G, 40G, 46G, 50BF, 51V,
- 59G, 59N, 60G, 78G, 81L, 81H, 87G, 64F
- - Generator Transformer Protection Relay
- 87GT, 87TN, 50/51GT, 51NGT
- - Unit Aux Transformer Relay
- 87UAT, 50/51UAT, 51N UAT
- - Medium Voltage Protection Relay
- - Low Voltage Protection Relay
- - 150kV Protection Relay